Stone Coverage Formula:
From: | To: |
The landscaping stone coverage formula calculates the amount of stone (in tons) needed to cover a specific area at a given depth. It accounts for the area dimensions and the density of the stone material.
The calculator uses the following formula:
Where:
Explanation: The formula first converts all measurements to cubic yards, then multiplies by the stone's density to get the weight in tons.
Details: Proper stone calculation ensures you purchase the right amount of material - not too little that leaves your project incomplete, and not too much that wastes money.
Tips: Measure your area carefully in feet. For depth, common landscaping applications use 2-4 inches. Typical stone densities range from 1.4 to 1.7 tons per cubic yard.
Q1: What's the typical density for different stone types?
A: Crushed stone is typically 1.4-1.6 tons/cu yd, while granite is about 1.7 tons/cu yd. Lava rock is lighter at about 1.2 tons/cu yd.
Q2: How do I measure irregularly shaped areas?
A: Break the area into rectangular sections, calculate each separately, then sum the results.
Q3: Should I order extra stone?
A: It's recommended to order 10-15% extra to account for compaction, settling, and measurement errors.
Q4: How deep should I lay landscaping stone?
A: For pathways, 2-3 inches is common. For driveways, 4-6 inches is recommended. Decorative areas typically use 1-2 inches.
Q5: Can I use this for gravel calculations?
A: Yes, this formula works for any bulk landscaping material where you know the density.